Sunday, June 18, 2017

Exclusive Sujal Nepal

The Narayangadh-Muglin road section, which was obstructed by a landslide, opened on Sunday after around 12 hours. The road resumed for traffic following the removal of the debris at Kalikhola, 2.5 km towards Narayangadh from Mugling, said Shiva Khanal, engineer at the Narayan-Muglin Road Project. The road stretch had come to a halt since 1am. Three excavators and a loader were mobilised to clear the debris, he added. Earlier, a landslide at the same place on Saturday morning had obstructed the traffic movement. (PR)

0 comments:

Post a Comment